1

Energy-Efficient 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation boosts process efficiency while cutting overall power consumption and CO₂ discharge. https://socialinplace.com/story6183310/advanced-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story