He included that Period two would cover the extend within the Lekki next toll gate to the Ajah under-bridge and will be divided into four sections. “Motorists from Ajah inward Lekki is going to be diverted to 1 lane although repairs are ongoing on one other lane,” Osiyemi mentioned. “When https://donalde329afm3.iyublog.com/profile