Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://bookmarkloves.com/story22999354/penmann-ltd-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-supporting-fsi-phase-1-2