The foundation was built before the remaining design for the roofs was completed and it was not identified what the total weight of the finished roofs could be. This brought on re-engineering challenges afterwards during the challenge. Utzon's plywood corridor layouts, and his acoustic and seating patterns for the interior https://helenh173mno2.blogdeazar.com/profile