The first park features a capacity of two hundred MW when Sandrini II has a potential of one hundred MW. The entire price of both jobs were not disclosed nonetheless, during development, over two hundred staff were being used. The projects are predicted to discover A few positions opening up https://residentialsolarinstallationcalifornia.finance.blog/2024/08/23/what-should-you-consider-when-hiring-commercial-solar-contractors/