Inspect the equipment to insure there aren't any rigid connections into the duct work or electrical utility Applications needed to the position Leveling block Resolution: All connections from your unit through the restrained spring isolators the should be designed for these masses. For concrete attachments, this requires ICC-ES Licensed anchors. https://spring-isolators-ferguson24680.life3dblog.com/28076729/getting-my-spring-isolators-grainger-to-work